Pedestrian Access: North-West Farnham#
Residents around Kingsdown, Old Park Lane and north-west Farnham have no safe, dependable walking route into the town centre in all weathers. This page sets out what’s being asked for, where things stand, and how we got here.
Status: looking for a local organisation to lead the FP86 improvements. We’ve asked the North West Farnham Residents’ Association (NWFRA) to consider it.
Last updated 15 November 2026
Key terms, if you’re new to this:
- FP86, FP92 and so on are public footpaths, numbered on Surrey County Council’s rights of way map (shown below).
- Neighbourhood CIL, put simply, is grant money from Farnham Town Council for local improvements. Charities and community groups can apply. Read the Council’s guidance.
- NWFRA is the North West Farnham Residents’ Association. OPLRA is the Old Park Lane Residents Association.
What we're asking for on FP86
FP86 is the public footpath from Castle Hill (by Fox Hollow) down to the car park. It’s the most direct walking route into town for many residents of north-west Farnham, but its loose stone surface gets slippery in winter.
- A sealed, all-weather surface. Upgrade FP86 from loose stone to a sealed surface such as asphalt, so it’s safe and step-free all year round. This would be an improvement to a higher standard, not a repair: Surrey County Council already maintains the path as it is. Surrey’s very rough estimate is £20,000 to £30,000.
- Lighting as a separate, later step. Lighting is wanted, but it’s unclear who would pay to run and maintain the lights, so we suggest treating it separately from the surface. Surrey’s very rough estimate is around £15,000 per lighting column.
- A local organisation to lead it. Neighbourhood CIL can only go to a not-for-profit group that will run the project. Farnham Voice can’t apply. We’ve asked NWFRA whether it could lead the improvements and a funding application.
- Support for whoever leads. Letters of support from residents, local groups and councillors will help any application.
All figures are Surrey’s very rough estimates and would need firm quotes.

Public rights of way in north-west Farnham. FP92 runs south from Old Park Lane; FP86 runs from Castle Hill down to the car park; FP87 and FP95 are nearby. Source: Surrey County Council rights of way map.
Where things stand#
As of 15 November 2026:
- FP86 (Castle Hill to the car park): this is the path most likely to be improved soon. It’s being treated as a standalone project, so it doesn’t depend on wider road changes, and the surface upgrade may be small enough for Neighbourhood CIL.
- Who will lead it: the organisation first considering it is preparing a different funding bid, so it has stepped back. Neither NWFRA nor OPLRA has yet confirmed it will take FP86 forward; both may need time to discuss it at committee. On 13 November we asked NWFRA to consider leading it (read the email).
- Technical questions: we’ve asked Surrey’s Countryside Access Team some outstanding questions, and will share the reply here.
- FP92 (Old Park Lane): this path runs through the Old Park Lane development site, so what happens to it depends on details the developer hasn’t settled yet (the “reserved matters”, explained below). What the community wants is clear: a safe, all-weather, step-free and properly lit walking route between Old Park and the town centre.
- FP87: changes haven’t been discussed yet, although some work might be possible alongside improvements to the paths next to it.
- Funding and deadlines: Farnham Town Council’s Neighbourhood CIL fund is open. The published deadline for small and standard applications is 3 January 2027, and micro applications (up to £10,000) can be made at any time. Higher-cost proposals may have an earlier deadline, believed to be 30 November 2026; this needs confirming with the Town Council. Our Neighbourhood CIL explainer summarises how the fund works.
How you can help#
- If you’re involved with NWFRA or OPLRA, you could encourage your committee to consider leading or supporting the FP86 improvements.
- If you’d like to support the improvements, a short letter of support will help whoever applies for funding. Get in touch and we’ll point you to the right people.
- If you spot a problem on a footpath, report it to Surrey (see below).
Reporting a problem on a footpath
Surrey County Council’s Countryside Access Team advises:
- The best way to report an issue on a public right of way is through Surrey’s public rights of way reporting page.
- Alternatively, a problem reported through Surrey’s highways reporting tool (FixMyStreet) will reach the team, although there may be a slight delay.
- For a problem you’ve already reported, or for general enquiries, email rightsofway@surreycc.gov.uk.
These details may change when West Surrey Council replaces Surrey County Council and Waverley on 1 April 2027. We’ll check them again then.
Farnham Voice’s role#
Farnham Voice can’t apply for the funding or deliver the work, and that was never our intended role. We’ve researched the options, brought residents, associations and council representatives together, and published what we found here.
The proposal now needs a local organisation to take ownership of it. We’ll keep this page updated as responses, planning information and funding decisions come in.
A bigger idea for later#
Residents on Castle Hill have suggested a safe pavement from the FP95 side all the way to the turn-out for Castle Court. That would make room for a safe crossing just before the castle steps near Kingsdown. Kingsdown residents have already raised concerns about poor sight-lines at their entrance by the wall, which this could also help with.

The suggested pavement, shaded grey, on the Kingsdown side of Castle Hill from the FP95 side to the turn-out for Castle Court. A residents’ suggestion, not an assessed proposal.

How a crossing near the Kingsdown entrance might look. An illustration only, not a design or an approved scheme. Original photography, approved for use only on this website.
This would be a larger piece of work and is unlikely to be funded through Neighbourhood CIL. It would more likely need Strategic CIL, discussed with West Surrey Council once it takes over in April 2027. We understand Neighbourhood CIL may be able to top up funding for smaller projects, depending on the reasons, constraints and evidence.
No engineering feasibility assessment, funding allocation or delivery commitment is confirmed by this update.
Background#
Background How this started, and why we focused on FP86 and FP92
Earlier in 2026, Farnham Voice started the Safe Crossings community effort for the town. That investigation into safer pedestrian crossings also identified concerns about existing pedestrian access into Farnham town centre, particularly for residents around Kingsdown, Old Park Lane and north-west Farnham.
Initial engagement considered both crossing improvements around Castle Hill and opportunities to improve existing public rights of way.
It was then made clear that Strategic Community Infrastructure Levy (CIL) funding would not be available for new crossings. Surrey County Council Highways advised that it will not consider additional traffic scheme proposals within Farnham until the effectiveness of the FIP/TCIP town centre works can be evaluated, which could take up to eighteen months.
Officials also stated that their current focus is “supporting residents in setting up additional Speedwatch groups and sourcing funding for electronic speed recording devices. This data will be used directly by the Unitary Authority and Surrey Police to assess future speed calming and crossing needs.”
With that in mind, Farnham Voice paused further independent investigation into crossing proposals, to avoid duplicating official work.
Attention shifted towards practical improvements to existing pedestrian routes, particularly FP86 and FP92.
FP95 and FP87 were also considered. However, the missing pavement connection between FP95 and FP86 introduced additional highway dependencies, so the initial assessment focused on improvements that might be simpler and less expensive to deliver.
This was an initial community assessment, not a formal engineering or feasibility conclusion.
Wider context The wider footpath network around the Old Park Lane development
This is background on the wider network of paths across the whole area. It wasn’t discussed at the meeting on 21 October, which focused on the more immediate question of walking access from Old Park Lane into town. It’s here to help with the bigger picture, drawn from the published planning documents.
Which paths are involved. In its response to the planning application, Surrey County Council’s Countryside Access Team listed the public rights of way affected by the Old Park Lane development:
- Directly affected: Footpaths 92, 94 and 7
- Affected indirectly, by more people using them: Footpaths 5, 6 and 87
It noted that “the majority of the above paths are unimproved”, and asked for a contribution towards widening and resurfacing them through a Section 106 agreement. Waverley’s committee report described that request as acceptable.
How the paths relate to the site. Footpath 94 runs along the northern edge of the site. Footpath 7 runs north to south across it. Footpaths 92 and 94 both connect to Bridleway 185, which forms part of Old Park Lane.
FP92 and St Swithun’s Way. FP92 is part of St Swithun’s Way, a long-distance walking route between Winchester and Farnham that roughly follows part of a historic pilgrimage route. FP92 crosses the far eastern end of the site. On the illustrative plans, that end is mostly landscaped to protect views towards Farnham Castle and other heritage assets, with a community orchard beside FP92. The planning inspector noted that the orchard would sit within the view of St Andrew’s Church tower from the route, and that the tower would stay visible from St Swithun’s Way through the layout and landscaping. So FP92 is within the site boundary, but on the illustrative plans it runs beside the orchard and landscaping rather than through the new housing. The final layout is a reserved matter.
What the documents say about improving FP92:
- Pre-application advice to the developer said FP92 “should be lit”, and that the steps where it joins the University for the Creative Arts site “should be improved to provide a further accessible route”.
- The developer’s Travel Plan proposed lighting a section of FP92 towards the University, and its Planning Statement mentions low-level bollard lighting between the site and FP92.
- Waverley’s committee report noted that “FP 7 and FP 92 are not fully within the site and, as such, the comprehensive upgrade of these routes may not be within the developer’s gift.”
We haven’t found these FP92 improvements among the appeal conditions. Some detail will only be settled at the reserved matters stage.
Other connections. The permission includes a public open space and country park to the north of the new homes, with new footpaths across the site. The inspector noted that “an additional footpath would be provided to create permeability and improved access for pedestrians”. Waverley’s committee report also mentioned the possibility of a 3-metre-wide shared path for walking and cycling through the site.
See the paths for yourself. Surrey’s Countryside interactive map shows every public right of way with its number. Search for Old Park Lane, Farnham, and zoom in north of the University for the Creative Arts. Click a path to see its number.
Official documents, all from Waverley’s Old Park Lane planning inquiry page:
- Appeal decision, 11 June 2025 (APP/R3650/W/24/3353124): paragraphs 16, 60–61 and 86, and the conditions
- Surrey County Council Countryside Access response, 14 July 2023 (CD3.12)
- Waverley committee report (CD4.2)
- Design and Access Statement (CD1.11): the pedestrian routes section
- Planning Statement (CD1.3): including the pre-application advice on rights of way
- Heritage Statement (CD1.18): St Swithun’s Way
- Travel Plan (CD2.2): lighting on FP92 and improvements to FP7
- Statement of Common Ground (CD8.3): how the paths connect to Old Park Lane
- St Swithun’s Way (Hampshire County Council)
A summary of published documents, not a formal interpretation. Check the documents themselves for the exact wording.
What came up at the meeting#
For anyone who wasn’t there, these explain the key points from the discussion on 21 October.
Surrey County Council Countryside Access Team (West Surrey): what they do
The Countryside Access Team (Maintenance and Enforcement, West Surrey) looks after public rights of way such as FP86 and FP92. At the community meeting on 21 October 2026, the attending Countryside Access Officer explained the team’s responsibilities, powers and constraints.
The team maintains, protects and enforces existing public rights of way. Its authority and resources are limited, particularly where proposed improvements go beyond its statutory maintenance obligations.
- Maintenance: investigating path conditions, drainage, vegetation, obstructions and defective infrastructure.
- Enforcement: dealing with unlawful obstructions and relevant landowner responsibilities.
- Safety: assessing hazards and prioritising work according to risk and available resources.
- Improvements: advising on possible upgrades, although substantial works may need separate funding and approval.
- Coordination: working with other council departments, developers and landowners where responsibilities overlap.
Maintaining a path is not the same as improving it. Keeping a footpath to its required standard is the team’s job. Improving it for better year-round access, through significant resurfacing, widening or associated highway works, may involve additional funding, permissions and other organisations.
This reflects what was explained at the community meeting. It is not a formal statement of policy from Surrey County Council.
Planning What are "reserved matters"?
Reserved matters came up at the meeting because they affect what happens to FP92. In short, big housing developments are often approved in two stages.
- Outline permission agrees, in principle, that the development can go ahead, for example “up to 83 homes on this land”.
- Reserved matters are the details that were left until later. They cover:
- Layout: where the homes, roads and paths go
- Access: how people get in and out, on foot and by car
- Appearance: what the buildings look like
- Landscaping: trees, planting, open spaces and surfaces
- Scale: how big the buildings are
The developer has to apply for approval of these details, usually within three years of the outline permission, and building can’t start until they’re approved.
Why it matters here. FP92 runs through the Old Park Lane development site, which has outline permission (application WA/2023/01467, allowed on appeal). How the paths through the site will actually look and connect is likely to be settled through the reserved matters and planning conditions. That’s why questions about FP92 are still open.
Find out more: the Planning Portal’s guide to reserved matters explains the process in more detail.
History#
Newest first. Open any entry to read what happened.
13 November 2026 Email to NWFRA: would it lead the FP86 improvements?
In short: the organisation first considering the FP86 proposal is preparing another funding bid, and no other eligible organisation has yet offered to take FP86 forward. So Farnham Voice asked the North West Farnham Residents’ Association (NWFRA) whether it could lead the FP86 improvements and a Neighbourhood CIL funding application. There’s no expectation that it must.
Farnham Voice can’t apply for the funding or deliver the work itself, and never intended to. Our role has been to research the options and bring people together. The email hands that work over to whoever takes the proposal on.
The email went to the NWFRA chair, copied to Cllr Murray (Farnham Town Council). People who attended the meeting on 21 October were blind-copied, to protect their contact details.
13 November 2026
Dear NWFRA Chair,
Thank you for your patience while I came back to you after a busy week. There were several meetings I wanted to attend before providing this update. I hope you managed to attend the SOFRA meeting. It was encouraging to hear them echo our calls for greater collaboration across Farnham.
In that spirit, and following our previous correspondence, I wanted to share a further update on the proposed FP86 footpath improvements and the opportunity to secure Neighbourhood Community Infrastructure Levy (NCIL) funding.
The organisation originally considering taking the proposal forward is already preparing another funding bid and understandably does not wish to submit competing applications in the same round or overburden itself.
As we haven’t yet been made aware of another eligible organisation willing to take the proposal forward, I’d be grateful if NWFRA could reconsider whether it might be able to lead the FP86 improvements and a potential NCIL funding application.
I appreciate this would involve a commitment of time and resources, and there is no expectation that NWFRA must take it on. Our hope is simply that the research and connections established so far can help an interested organisation make progress, whether now or in a future funding round. We feel the proposal would benefit from future coordination being led by those directly involved in delivering it, rather than Farnham Voice remaining the point of contact.
Thank you for considering the opportunity. Full information is below.
Kind regards,
Farnham Voice
The information included with the email:
Current position
The organisation originally considering taking the proposal forward is already preparing another funding bid and understandably does not wish to submit competing applications in the same round or overburden itself.
- Neither NWFRA nor OPLRA has confirmed to Farnham Voice within the past week that it will be taking the proposal forward. I appreciate that both associations may need time to discuss this internally.
- I understand that the OPLRA officer who attended our meeting on 21 October has been advocating strongly for the improvements, which is encouraging.
Given that we haven’t been made aware of another eligible organisation willing to take the proposal forward, I’d be grateful if NWFRA could reconsider whether it might be able to lead the FP86 improvements and a potential NCIL funding application.
I appreciate this would involve a commitment of time and resources, and there is no expectation that NWFRA must take it on. However, with the research and potential funding routes already identified, it would be encouraging to see the opportunity explored further, whether in this funding round or a future one.
In terms of support
- I’ve copied in Cllr Murray, who may be able to assist with coordination should NWFRA wish to proceed.
- I’ll encourage the other organisation to provide a letter of support.
- I hope OPLRA would also be willing to support the proposal, even if it is unable to lead it at present.
- Farnham Voice would be happy to provide a letter of support.
- If NWFRA does decide to proceed, I’d be happy to direct other interested residents and supporters towards the effort.
Research and handover
As discussed at our meeting on 21 October, Farnham Voice is not eligible to submit the funding application or deliver the project, nor was that ever our intended role.
- Our aim has been to research the opportunities, bring interested parties together and identify a possible route forward.
- The proposal has always depended on an eligible organisation being willing to take ownership and deliver the improvements.
- The supporting research, funding information and proposed next steps have been available since the October meeting on this page.
- The meeting was intended to help establish those connections and make it easier for an interested organisation to take the proposal forward.
Once again, we appreciate that these decisions can take time, particularly where committee discussions and other commitments are involved.
Funding opportunities, outstanding questions and next steps
The current Neighbourhood CIL guidance is available from Farnham Town Council.
- Funding deadlines: the published deadline for Small and Standard applications is 3 January 2027, while Micro awards of up to £10,000 operate on a rolling basis. Higher-cost proposals may have an earlier deadline, believed to be 30 November 2026, although this requires confirmation from Farnham Town Council. Please reach out to Cllr Murray for anything further if needed.
- Eligibility: footpath improvements are identified as potentially eligible projects, subject to the relevant funding criteria.
- Project scope: it may be worth considering the footpath surface and lighting improvements separately, given the outstanding questions around lighting responsibilities and maintenance.
- Technical clarification: I’ve contacted the Countryside Access Team about several outstanding points and will share their response once received. The officer has been away.
- Other opportunities: this may not be the only funding round, and alternative funding routes may also be available. We’ll continue to share relevant findings as they emerge.
October 2026 Town Council reply
The Town Council has confirmed that details relating to the emails on this page will be published shortly. Questions can then be directed to ward councillors.
24 October 2026 Email to Cllr Murray: this record, and next steps for Neighbourhood CIL
Farnham Voice wrote to Cllr Murray sharing this page and suggesting how the Council and community efforts could work together on the Neighbourhood CIL pilot.
24 October 2026
Dear Cllr Murray,
Further to my email on 22 October, and as promised, a brief history of this work on pedestrian access from Old Park Lane and north-west Farnham is now available here. This is a regularly updated record, with further details still awaited from some attendees at Wednesday’s meeting.
farnhamvoice.uk/docs/surveys/safe-crossings/pedestrian-access/
This covers the background, current position, discussions at the community meeting on 21 October, and some correspondence with the relevant authorities to date.
Following the Thursday meeting, a review of the Neighbourhood CIL guidance has helped establish an initial understanding of how the pilot is intended to work, although some details still need clarification.
One thing already seems clear: the pilot presents a valuable opportunity for closer collaboration between the Council and community efforts.
I’m sure the Council is already considering how best to communicate the Neighbourhood CIL guidance to the wider community. If not already proposed, a dedicated meeting between local community effort representatives and an appropriate Council officer familiar with the guidance would be valuable. This would allow questions around eligibility, participation and practical requirements to be addressed ahead of the pilot. Beyond this, I would propose that the Council works with existing efforts to develop an exemplar approach to Neighbourhood CIL, potentially using improvements to FP86 as a practical example.
Farnham Voice has already been working to connect local efforts, several of which are open to collaborating. I have also begun examining how their different structures might affect eligibility and participation. There are also pockets of residents across Farnham who support these improvements but lack established local community representation. I would be happy to help connect them with councillors through meetings like Wednesday’s, particularly given the wider case for improvements around Castle Hill that could benefit the town as a whole.
The Council’s commitment to providing a more detailed response is appreciated, as is the time already given to helping residents understand the options. Hopefully, this can build on the constructive engagement underway and strengthen relationships between the Council and the wider community, both for this pilot and future initiatives.
22 October 2026 Follow-up with council representatives
Following the meeting, Farnham Voice prepared a consolidated request for guidance on FP86, FP92 and associated pedestrian access improvements.
It sought clarification on developer responsibilities, reserved matters, alternative funding, practical constraints and the appropriate route for progressing improvements. Particular attention was given to whether Neighbourhood CIL or other available funding could support improvements not secured through the development.
A Farnham Voice representative also attended the Council’s meeting that evening, to make sure the questions were presented effectively on behalf of the associations who couldn’t attend.
The letter sent to the Farnham Town Council Town Clerk ahead of the Council’s meeting on 22 October:
22 October 2026
Dear Town Clerk,
Last night, Farnham Voice held a meeting bringing together residents, local associations and council representatives to discuss pedestrian access from Old Park Lane into Farnham town centre. We encouraged residents and associations to engage directly with their ward councillors and participate in council meetings.
Following this meeting, I was forwarded the following question, intended for Agenda Item 4 at tonight’s meeting:
“Old Park residents seek a safe, all-weather, step-free and well-lit footpath into Farnham town centre. Will the Council ensure sufficient funding is secured from the approved Hop Fields housing development to deliver this much-needed link?”
Alongside this, we understand that Neighbourhood Community Infrastructure Levy (CIL) funding may offer a potential route for improvements to local footpaths, particularly FP86. We also recognise that FP92 involves additional considerations relating to existing development and ongoing discussions.
With this in mind, we would appreciate the Council’s guidance on the following:
- Funding: Could Neighbourhood CIL support improvements to FP86, FP87 and/or FP92? If not, what alternative funding mechanisms could be explored?
- Proposal: What would a strong, evidence-based proposal need to demonstrate to justify these improvements?
- Process: How should residents and community groups prepare and submit a proposal, and what are the next steps?
- Timescales and constraints: What is a realistic timeframe for progressing these improvements? What practical, financial or regulatory constraints might prevent progress? We recognise that some improvements may not be viable at present, and understanding why would be equally valuable in helping residents set realistic expectations and identify possible next steps.
- Community evidence: What consultation, community feedback or supporting evidence would strengthen the case for funding?
Our intention is to help residents and local associations understand the available routes forward, gather the necessary community evidence and work constructively with the Council.
We appreciate that some of this work is already underway and would welcome guidance on how community efforts can best support existing processes rather than duplicate them.
Thank you for your time and assistance.
21 October 2026 Community and council representatives meeting
Farnham Voice facilitated a meeting at The Hop Blossom involving affected residents, community representatives and local council representatives.
A Countryside Access Officer from Surrey County Council explained the team’s responsibilities and the practical constraints on public rights of way. The discussion distinguished between maintaining an existing path to its required standard and improving it to provide better year-round access. Substantial improvements, such as resurfacing or widening, may need additional funding, permissions and coordination beyond routine maintenance.
FP92: development and reserved matters. Questions remain about how footpath improvements relate to developer proposals and unresolved reserved matters. Further clarification is needed on which improvements may be secured through the development, who would be responsible, and whether additional funding would be needed.
FP86: potential standalone improvements. Rather than making FP86 dependent on wider highway changes, the emerging proposal was to investigate what could be achieved along the existing route on its own. That would let practical improvements be considered while more complex connections continue through separate planning discussions.
Wider pedestrian connections identified for further investigation:
- A potential pavement connection from FP95 towards the Fox Hollow footpath entrance.
- A possible pedestrian crossing before the Castle Hill steps, connecting towards that entrance.
- Adjoining pedestrian access improvements through outstanding development and reserved matters discussions.
These remain ideas for investigation, not approved or technically assessed proposals.
Why a focused approach matters. Pavement alterations and new crossings are considerably more complex than improving an existing footpath. They can involve highway safety assessments, planning requirements, land ownership, developer obligations and coordination between several councils and other parties. Trying to progress everything as one project could add dependencies and delay improvements that might otherwise be achievable. So the emerging approach is to prioritise FP86 as a standalone improvement, while exploring how adjoining connections could be supported through existing planning and reserved matters discussions.
This records the community discussion and emerging direction following the meeting. It is not a formal engineering assessment, approved scheme or commitment from Surrey County Council.
October 2026 Correspondence with Surrey Countryside Access and Waverley
Farnham Voice contacted Surrey County Council’s Countryside Access Team to clarify responsibilities for existing public rights of way and how potential improvements might be progressed. The replies informed later discussions about maintenance obligations, improvements needing additional funding, and the involvement of other authorities and landowners.
What Surrey said about FP92 (Old Park Lane):
- The enclosed section from Old Park Lane was resurfaced last year in unbound stone. Surrey hadn’t received complaints about it.
- The rest of the route was left as it is: the landowner had livestock in the fields and wouldn’t allow the path to be fenced, so a new surface would quickly have been trodden in.
- Paths through the development site (WA/2023/01467) would normally be improved through a Section 278 agreement.
What Waverley said about FP92: the request is mainly for Surrey. There’s very little relevant information in the planning files, including the published Section 106 agreement. Conditions 11 and 13 of WA/2025/02041 may say more once they’re discharged.
What Surrey said about FP86 (Castle Hill to the car park):
- The path was resurfaced last year in unbound stone. Surrey hadn’t received complaints about it.
- The only further surface improvement would be asphalt, and lighting would be a matter for Surrey Highways. Neither has identified funding.
- Very rough estimates, needing further investigation: around £20,000 to £30,000 to asphalt the path, and around £15,000 per lighting column.
- If funding is found, Surrey would be happy to work with Farnham Voice, the Town Council and others to deliver improvements.
Full correspondence will be made available here, subject to appropriate redaction.
Earlier in 2026 Initial investigation: safer crossings and pedestrian routes
As part of the Safe Crossings community effort it started for the town, Farnham Voice gathered feedback from residents about pedestrian access, crossing safety and the connections between residential neighbourhoods and the town centre.
The investigation identified FP86 and FP92 as priorities for further consideration, while recognising the potential importance of FP95, FP87 and adjoining highway connections.
Related pages#
- Safe Crossings: the wider crossing safety work
- Heritage Considerations: why a crossing near Old Park Lane is difficult
- Collision Records: the Castle Hill collision cluster
References: Surrey County Council IC46186 · Waverley Borough Council AI2/32650